Kentucky Transportation Cabinet http://wfpl.org en Bill Would Allow Public-Private Partnerships For Big Construction Projects http://wfpl.org/post/bill-would-allow-public-private-partnerships-big-construction-projects <p></p><p>State Rep.&nbsp;Sannie Overly has filed a bill that will allow the Kentucky Transportation Cabinet to explore public-private partnerships to help construction projects with big price tags.</p><p>The bill doesn't specifically name any projects, but Kentucky currently has multiple instances where the bill could help work start, namely the Brent Spence Bridge in Northern Kentucky and Interstate 69 in western Kentucky.</p><p>Overly, a Paris Democrat, said the goal is to help the state have one more avenue to help fund its infrastructure projects.</p> Fri, 22 Feb 2013 18:51:39 +0000 Kenny Colston 4149 at http://wfpl.org Bill Would Allow Public-Private Partnerships For Big Construction Projects Clark Bridge Repairs Begin; Rush Hour Delays Likely http://wfpl.org/post/clark-bridge-repairs-begin-rush-hour-delays-likely Motorists who use the Clark Memorial Bridge will likely endure some rush hour delays as repair work gets underway this week.<p> Andrea Clifford with the Kentucky Transportation Cabinet says the work will require around-the-clock lane reductions.<p> "The contractor is allowed two, 30 day segments," Clifford said. Mon, 14 Jan 2013 13:00:00 +0000 Rick Howlett 3386 at http://wfpl.org Clark Bridge Repairs Begin; Rush Hour Delays Likely New Milton-Madison Bridge Section To Be Hoisted Today http://wfpl.org/post/new-milton-madison-bridge-section-be-hoisted-today <P>Crews have begun a second major step in the replacement of the 82 year old Milton-Madison Bridge over the Ohio River.<p> <P>A 727-foot section of steel truss will be <A href="http://www.miltonmadisonbridge.com/wp-content/uploads/2012/09/Second-liftNR-9-5-12.pdf">hoisted into place</A> today on temporary piers alongside the existing bridge.<p> <P>The 2,000 ton section was preassembled on the Kentucky side of the river and is being floated to the site on barges.<p> <P>The Kentucky Transportation Cabinet’s Andrea Clifford says the process was to begin just after midnight, weather permitting Mon, 10 Sep 2012 12:30:00 +0000 Rick Howlett 1578 at http://wfpl.org New Milton-Madison Bridge Section To Be Hoisted Today Brownsboro Road Section To Be Closed For Ten Days http://wfpl.org/post/brownsboro-road-section-be-closed-ten-days <p>The summer road maintenance season continues with the <a href="http://transportation.ky.gov/District-5/Press%20Releases/july%2024%202012%20(Brownsboro%20Road%20closure).doc">closure of a short stretch of Brownsboro Road </a>for ten days starting later this week.</p><p>The stretch will be shut down starting Friday evening to allow for interchange improvements.</p><p>&quot;This section is commonly known by people in the area as Old Brownsboro Road, and it&rsquo;s the section between U.S. 42 and Warrington Way,&quot; says Andrea Clifford with the Kentucky Transportation Cabinet</p> Mon, 30 Jul 2012 04:04:00 +0000 Rick Howlett 1147 at http://wfpl.org Brownsboro Road Section To Be Closed For Ten Days Kennedy Bridge Repair Work Winding Down http://wfpl.org/post/kennedy-bridge-repair-work-winding-down <p>The Kennedy Memorial Bridge deck replacement project is nearly complete.&nbsp;</p><p>The $18 million repair job began June 21, forcing the closure of two or more lanes of traffic in each direction, shutting down several ramps and causing daily traffic delays.</p><p>The <a href="http://transportation.ky.gov/Pages/default.aspx">Kentucky Transportation Cabinet&rsquo;s </a>Andrea Clifford says all lanes and ramps at the bridge are scheduled to be open by next Wednesday, August 1.</p> Thu, 26 Jul 2012 20:00:29 +0000 Rick Howlett 1137 at http://wfpl.org Kennedy Bridge Repair Work Winding Down Portion Of I-65 Southbound To Be Closed For Repairs http://wfpl.org/post/portion-i-65-southbound-be-closed-repairs <p>The southbound lanes of Interstate-65 between downtown Louisville and the Watterson Expressway will be shut down this weekend to allow for paving.</p><p>Motorists who come into Louisville via the Kennedy Bridge will be rerouted on Interstate-64.&nbsp; The closure begins at 7:00pm this&nbsp; evening and continues through 5:00am Monday.</p><p>It&rsquo;s one of several <a href="http://transportation.ky.gov/District-5/Pages/I-65-Construction.aspx">major repair projects </a>underway in the Louisville area causing traffic delays and detours.</p> Fri, 20 Jul 2012 20:08:22 +0000 Rick Howlett 1080 at http://wfpl.org Portion Of I-65 Southbound To Be Closed For Repairs I-65 Section To Be Shut Down For Weekend Repairs http://wfpl.org/post/i-65-section-be-shut-down-weekend-repairs <p>A three-mile stretch of Interstate 65 northbound in downtown Louisville will be shut down this weekend to allow for <a href="http://transportation.ky.gov/District-5/Pages/I-65-Construction.aspx">repaving work</a>.</p><p>The northbound lanes of I-65 from the Watterson Expressway to Chestnut Street will be closed from 7:00 this evening&nbsp; until 5:00am Monday.&nbsp;</p><p>Andrea Clifford with the Kentucky Transportation Cabinet says it&rsquo;s more efficient to shut down the entire stretch than to allow limited traffic and pave one lane at a time.</p> Fri, 13 Jul 2012 19:31:54 +0000 Rick Howlett 1004 at http://wfpl.org I-65 Section To Be Shut Down For Weekend Repairs I-65 Ramp Reopenings Delayed Again http://wfpl.org/post/i-65-ramp-reopenings-delayed-again <p>For the second time this week, the reopening of a busy portion of Louisville&rsquo;s Spaghetti Junction has been delayed.</p><p>The exit ramps from Interstate-65 northbound to I-64 west and east and northbound I-71 have been closed since June 25 as part of the larger <a href="http://transportation.ky.gov/District-5/Pages/I-65-Construction.aspx">Kennedy Bridge repair project</a>.</p> Tue, 10 Jul 2012 20:17:22 +0000 Rick Howlett 968 at http://wfpl.org I-65 Ramp Reopenings Delayed Again Lighting Problem On Eggners Ferry Bridge Fixed http://wfpl.org/post/lighting-problem-eggners-ferry-bridge-fixed <p>The Kentucky Transportation Cabinet says a wiring problem caused the navigation lights on the newly rebuilt Eggners Ferry Bridge in western Kentucky to malfunction&nbsp;Sunday &nbsp;night.</p><p>Spokesman Keith Todd says the&nbsp;outage was reported by a boater and confirmed by state police.&nbsp;&nbsp;&nbsp;&nbsp;</p><p>An electrical crew tracked down the problem this morning.</p> Mon, 02 Jul 2012 18:50:41 +0000 Rick Howlett 882 at http://wfpl.org Lighting Problem On Eggners Ferry Bridge Fixed Lane, Ramp Closures Continue For Kennedy Bridge Repairs http://wfpl.org/post/lane-ramp-closures-continue-kennedy-bridge-repairs <p>Motorists who use the Kennedy Memorial Bridge can expect more traffic delays this week as workers continue a <a href="http://transportation.ky.gov/District-5/Pages/I-65-Construction.aspx">major repair project</a>.</p><p>Southbound bridge traffic is still down to one lane to allow for some unexpected repair work. &nbsp;&nbsp;&nbsp;It will be expanded to two lanes on the morning of July 4<sup>th</sup>but Kentucky Transportation Cabinet spokeswoman Andrea Clifford says they&rsquo;ll need to shut down an additional northbound lane after that.</p> Mon, 02 Jul 2012 04:30:00 +0000 Rick Howlett 869 at http://wfpl.org Lane, Ramp Closures Continue For Kennedy Bridge Repairs