© 2024 Louisville Public Media

Public Files:
89.3 WFPL · 90.5 WUOL-FM · 91.9 WFPK

For assistance accessing our public files, please contact info@lpm.org or call 502-814-6500
89.3 WFPL News | 90.5 WUOL Classical 91.9 WFPK Music | KyCIR Investigations
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations
Stream: News Music Classical

Additional Study Ordered On Bridges Project

The Federal Highway Administration says cost cutting measures proposed for the Ohio River Bridges Project will require study, including a supplemental Environmental Impact Statement. The governors of Kentucky and Indiana and Mayor Greg Fischer last month proposed that the $4.1 billion project be scaled down to save $500 million.The suggested cutbacks include a smaller east end Bridge, reconfiguring Spaghetti Junction at its present site instead of moving it south, and removing walkways from a new downtown bridge.Project Manager Gary Valentine says the changes have potential environmental impacts not considered in earlier studies.He says the new review should take about a year, "which is within the timeline that we have indicated all along, with the goal of still getting into construction by August of 2012," he said.The bi-state bridges authority will also host an industry forum this week to discuss ways to make the project more cost-efficient.

Rick Howlett was midday host and the host of LPM's weekly talk show, "In Conversation." He was with LPM from 2001-2023 and held many different titles, including Morning Edition host, Assignment Editor and Interim News Director. He died in August 2023. Read a remembrance of Rick here.