© 2024 Louisville Public Media

Public Files:
89.3 WFPL · 90.5 WUOL-FM · 91.9 WFPK

For assistance accessing our public files, please contact info@lpm.org or call 502-814-6500
89.3 WFPL News | 90.5 WUOL Classical 91.9 WFPK Music | KyCIR Investigations
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations
Stream: News Music Classical

Kennedy Bridge Repairs To Begin

The first phase of repair work on the Kennedy Bridge begins tonight.The right northbound lane of the bridge will be closed until 8:00pm on Friday to allow for structural repairs. The exit ramp to Jeffersonville, Exit 0, will remain open. Following a break for the Kentucky Derby, the right southbound lane will be closed starting Sunday evening, May 6 through Friday, May 11.Also, the ramp from eastbound Interstate-64 to northbound I-65 will be closed overnight, tonight through Tuesday. It will be shut down from 8:00 each evening until 5:00 the following morning.The major repair work will begin in mid-June, with the Kennedy Bridge being reduced to two lanes in each direction to allow for deck repairs.

Rick Howlett was midday host and the host of LPM's weekly talk show, "In Conversation." He was with LPM from 2001-2023 and held many different titles, including Morning Edition host, Assignment Editor and Interim News Director. He died in August 2023. Read a remembrance of Rick here.